Burkes Falls East (10 MW) & West (10MW) PV Farm
44 kV Substation




Selected Projects

Solar Farm Projects

● Alderville 5 MW PV Substation
● Belleville North (10 MW) & South (10 MW) PV Farm Substations
● Blind River Solar 1, 2 & 3 (500kW)Substations
● Burkes Falls East (10MW) & West (10MW) PV Substations
● Crosby (10MW) PV Farm Substation
● Elmsley Solar Project & Substations - E (10MW) & W (10MW)
● Glendale (10MW) PV Farm Substation
● McCann (10MW) PV Farm Substation
● North Burgess (10MW) PV Farm Substation
● Rideau Lakes (10MW) PV Farm Substation
● Southgate Solar Substation (50MW)
● Stardale Solar Park 1 (10MW), 2 (7MW) & 3 (10MW)Substations
● St. Isidore Solar Project & Substations- A (10MW) & B (10MW)
● Sunny Shores PV Farm (10MW) Substation
● Waubaushene 3 (10MW), 4 (8MW) & 5 (10MW) PV Farm Substation
● Windsor Solar Substation (50MW)







   

Location: Ryerson Township, Ontario
Owner: Northland Power
Contractor: EPTCON Ltd.
Engineer: OneLine Engineering


OneLine Engineering provided complete electrical engineering and design services for two 44 kV interconnection substations for two 10 MW PV generating stations. The scope of work includes:

• Design of the protection relaying schemes for the substation, including detailed design of the relay panels and control building
• Design of the station inter-tripping schemes with the remote HONI stations
• Configuration of the protection relays and the RTU
• RTU communications integration with the inverter station master SCADA system
• Design of the cable trenches and duct work
• Design of the ground grid and equipment grounding systems
• Design of the station lighting systems
• Construction and commissioning assistance during system start up





OneLine Engineering is part of Cormorant Utility Services