CNP – Gilmore Station P&C Upgrade Project




Selected Projects

Substation Upgrade Projects

● Anjigami Transmission Station
● Clergue TS Protection System Upgrade Project
● CNP - Gilmore Station P & C Upgrade Project
● CNP - Station 17 P & C Upgrade Project
● CNP - Station 18 Expansion Project
● D. A. Watson Transmission Station
● Mackay Transmission Station
● Niagara-on-the-Lake Hydro 115kV  MTS #2
● Patrick Street Transmission Station
● Patrick Street Ground Grid Upgrade Project
● Third Line TS - Tertiary System & Capacitor Bank Configuration Study
● Third Line TS - T1 Replacement Project







   

Location: Fort Erie, Ontario
Owner: Canadian Niagara Power
Contractor: Canadian Niagara Power
Engineer: OneLine Engineering

OneLine Engineering provided complete electrical engineering and design services for the upgrading of the protection and control systems for an existing 34.5 – 8.3 kV substation. The scope of work included:

• Design of the protection relaying schemes for the transformer protection (T1 & T2), and feeder protection (GF1 – GF6), including detailed drawings required for assembly of the relay panels
• Production of all related electrical drawings including single line diagrams, AC & DC schematics, cable and termination schedules
• Equipment layout for the new relay panels in the existing control building
• Development of the upgraded stations communications and RTU system
• Design of new relay panels to replace the legacy protection relays for the existing protection systems
• Construction and commissioning assistance





OneLine Engineering is part of Cormorant Utility Services