OPG - Sir Adam Beck Plant 1
Generating Unit 3 – Output System Upgrade




Selected Projects

Hydro Generation Projects

● Hollingsworth Generating Station Upgrade
● Lower Mattagami - 115kV,
10MVA Construction Power Substation

● OPG - Arnprior Generating Station
● OPG - Calabogie Generating Station
● OPG - Chenaux Generating Station
● OPG - Sir Adam Beck Plant 1
● OPG - Sir Adam Beck Plant 1,
Generating Unit 10

● OPG - Cameron Falls Generating Station, DC System Upgrade







   

Location: Niagara-on-the-Lake, Ontario
Owner: Ontario Power Generation
Contractor: Comstock
Engineer: OneLine Engineering

OneLine Engineering provided detailed electrical and P&C engineering services for the upgrade of the Generating Unit 3 output system, including the replacement of the generator protection system. The scope of work includes:

• Site assessment and verification of the accuracy of the existing plant drawings
• Detailed design of the protection relay panels for the generator protection
• Production of the related electrical drawings including, AC and DC schematics, trip logic diagrams, connection wiring diagrams, cable schedules
• Production of detailed layout and section drawings for the replacement of the generator output buswork
• Production of all related equipment and installation specifications
• Updating existing plant drawings to incorporate the new equipment and cabling