Goshen Wind Farm 115 kV Switchyard – Control Building

Location: Grey County, Ontario

Owner: NextEra Energy Canada

Contractor: Mid-South Electrical

Project Summary

OneLine Engineering provided complete electrical engineering and design services for a modular control building to house the protection relays for the 115kV switchyard located at the Goshen Wind Farm. The scope of work includes:

• Detailed design of the protection relay panels for the substation protection systems
• Production of the related electrical drawings including, control building equipment layouts, connection wiring diagrams, cable schedules, control building grounding and lighting layouts
• Protection relay panel detailed assembly drawings
• Preparation of the detailed bill of material
• RTU communications integration with IESO/HONI
• Construction and commissioning assistance